Sign In | Join Free | My burrillandco.com |
|
Ask Lasest Price | |
Brand Name : | NTS |
Model Number : | NTS20 |
Certification : | ISO9001 CE |
Price : | 1.0 |
Supply Ability : | 50000per month |
Delivery Time : | 30 days |
1/2" coil bolt with coil tie and coil washer for concrete formwork accessories
COIL BOLTS | |||||||
34 IN (13MM.)DIA. SAFE WORK LOAD | 1 IN(25MM.)DIA. SAFE WORK LOAD | 1-1/4 IN(32 MM.)DIA. SAFE WORK LOAD | 1-1/2 IN.(38 MM.) DIA. SAFE WORK LOAD | ||||
TENSION | SHEAR | TENSION | SHEAR | TENSION | SHEAR | TENSION | SHEAR |
b | lb | lb | lb | lb | lb | lb | lb |
7,200 | 4,500 | 15,000 | 10,000 | 24,000 | 16,000 | 28,000 | 18,000 |
Mininum Coil Penetration | Mininum Coil Penetration | Mininum Coil Penetration | Mininum Coil Penetration | ||||
in. | in. | in. | in. | ||||
2-1/4 | 2-1/2 | 3 | 3 | ||||
Specs based on a 5:1 Safety Factor |
♦Coil bolts are designed with fast-threading ,self -cleaning threads.The threads are contoured to mate with the helix coil of Universal's coil ties and coil loops and has a hex nut head for easy lighting.
1/2" coil bolt with coil tie and coil washer for concrete formwork accessories Although coil bolts are very durable by design it is important that they be inspected for bending,cracks,worn threads or reductions of shank diamater due to overloading or misuse.such bolts must be discarded.
♦Coil bolts are never to be lightened using an impact wrench.
SIZE:
Comments: SWL provides a safety factor of apporoximately 2 to 1
.
Part No. | D Size | L Length | AC Across Flats | Carton Qty | Weight per 100pcs lbs | Safe Working Load lbs |
---|---|---|---|---|---|---|
N01 | 1/2" | 1-1/2" | 3/4" | 500 | 10.6 | 4,125 |
N02 | 1/2" | 2" | 3/4" | 500 | 12.8 | 4,125 |
N03 | 1/2" | 2-1/2" | 3/4" | 400 | 15.1 | 4,125 |
N04 | 1/2" | 3" | 3/4" | 300 | 17.1 | 4,125 |
N05 | 1/2" | 3-1/2" | 3/4" | 250 | 19.4 | 4,125 |
N06 | 1/2" | 4" | 3/4" | 250 | 21.6 | 4,125 |
N07 | 1/2" | 5" | 3/4" | 200 | 26.3 | 4,125 |
N08 | 1/2" | 6" | 3/4" | 150 | 30.7 | 4,125 |
N09 | 3/4" | 2" | 1-1/8" | 150 | 32.8 | 9,000 |
N10 | 3/4" | 2-1/2" | 1-1/8" | 150 | 39.4 | 9,000 |
N11 | 3/4" | 3" | 1-1/8" | 100 | 42.7 | 9,000 |
N12 | 3/4" | 3-1/2" | 1-1/8" | 100 | 47.8 | 9,000 |
N13 | 3/4" | 4" | 1-1/8" | 100 | 52.5 | 9,000 |
N14 | 3/4" | 5" | 1-1/8" | 75 | 62.5 | 9,000 |
N15 | 3/4" | 6" | 1-1/8" | 75 | 72.4 | 9,000 |
N16 | 5/8" | 2" | 1" | 100 | 21.8 | 7,500 |
N17 | 5/8" | 4" | 1" | 100 | 35.4 | 7,500 |
Here are the detailed pictures of the coil bolt:
The coil thread and head shape in detail view:
Packing pictures: first 100pcs put in the plastic bag and then put in carton box .all boxes on steel pallet
HOW TO USE THE COIL BOLT?
1.Price
We endeavor to improve overall efficiency and control the cost of production and sourcing. We constantly monitor the market and review our price to ensure that we are the most competitive price leader. In the event of price gap, we are ready to match the lower price the competitor for the best benefits of our customers.
2.Quality
Quality assurance is our primary foundation of sustainable
development. Our company has a dedicated quality management team to
strictly control the product quality for the target of meeting
customer requirements. In some rare cases that the products failed
to satisfy requirements, we have the established product return
policies and refund schemes.
3.Reliability
Since its establishment our company has enjoyed a good reputation
of reliability. Based on the requirements and specifications of
customer order, we stress the importance of satisfying customer
needs by reliably making, sourcing and delivering the products
through which we believe long-term customer relationships can be
built and sustained.
Q1. What is your terms of packing?
A: Generally, we pack our goods in neutral white boxes and brown
cartons for concrete lifting eye anchor. we can pack the goods in
your branded boxes after getting your authorization letters.
Q2. What is your terms of payment?
A: T/T 30% as deposit, and 70% against BL copy or LC at sight, 100% LC. We'll show you the photos of cast in channels goods and packages before you pay the balance.
Q3. What is your terms of delivery?
A: EXW, FOB, CFR, CIF, DDU.
Q4. How about your delivery time?
A: Generally, it will take 30 to 60 days after receiving your
advance payment. The specific delivery time depends
on the items and the quantity of your order.
Q5. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings. We
can build the molds and fixtures.
Q6. What is your sample policy?
A: We can supply the sample if we have ready parts in stock, but
the customers have to pay the sample cost and
the courier cost.
Q7. Do you test all your goods before delivery?
A: Yes, we have 100% test to ensure quality of concrete lifting eye
anchor before delivery.
![]() |